Buying an apartment in a new building is only the first step toward creating a ready-to-live-in home. Even if the developer has already completed some basic work, the property often requires significant additional work: from electrical and plumbing installations to finishing, lighting, doors, and other elements. That is why the question of how much an apartment renovation in a new building costs arises for practically every owner before the work even begins.
In 2026, there is no single universal amount that applies to every apartment. The budget depends on the floor area, the condition of the property after handover from the developer, the selected finishing level, materials, layout, and complexity of the engineering solutions. Apartments with the same floor area can have completely different budgets depending on whether the owner needs a practical standard renovation or a comprehensive interior with more expensive materials and additional solutions.
For an initial budget estimate, RSU package solutions can be used. According to the conditions provided by the company, four turnkey finishing options are available in 2026:
| Package | Price | Completion time | Warranty |
|---|---|---|---|
| Minimal (Standard) | 450 €/m² | from 80 days | 3 years |
| Optimal (Best Seller) | 560 €/m² | from 80 days | 3 years |
| Maximum (Premium) | 670 €/m² | from 80 days | 3 years |
| PLUS | 850 €/m² | from 80 days | 3 years |
For preliminary budget planning, you can multiply the apartment's floor area by the price of the selected package. However, the final estimate should be determined after assessing the specific property, its layout, condition, and the owner's requirements.
What Determines the Cost of Renovating an Apartment in a New Building
At first glance, it may seem that floor area is the main factor. It certainly matters, but it does not always determine the final budget on its own. Two apartments with the same floor area may require different amounts of work because of differences in layout, condition after handover from the developer, and the intended use of individual rooms.
Apartment Floor Area
The floor area directly affects the amount of materials and the scope of many works. As the area increases, more finishing materials, cables, pipes, flooring, and other components are required.
However, the relationship is not always linear. A small apartment may contain many functional zones within a limited area. As a result, the number of electrical points, plumbing connections, or complex structures per square meter may be quite high.
That is why the cost of an apartment renovation in a new building should be considered by combining the floor area with the specific scope of work.
Condition of the Apartment After Handover from the Developer
A new apartment can be handed over to the owner in different conditions. In one case, the property may require comprehensive preparation, while in another, part of the engineering systems or finishing work may already have been completed.
Before starting the renovation, it is worth assessing:
- the condition of the walls, floor, and ceiling;
- the presence and quality of electrical wiring;
- water supply and sewage systems;
- ventilation;
- installed windows and doors;
- heating system;
- the need for additional surface leveling;
- the possibility of changing the layout.
For an apartment without completed finishing, the scope of work will be larger. If some work has already been completed properly and corresponds to the future design, certain expenses can be reduced.
Before starting the renovation, it is also useful to inspect the property. RSU offers an apartment inspection service before accepting the property from the developer, which helps identify potential defects before finishing work begins.
Renovation Level
Another key factor is the owner's expectations for the future interior. Basic finishing and a premium renovation differ in terms of materials, the number of decorative solutions, and the complexity of execution.
The renovation level affects the budget through:
- the choice of finishing materials;
- the quality of sanitary fixtures;
- the type of flooring;
- doors and hardware;
- lighting;
- the number of decorative elements;
- the complexity of structures;
- additional engineering solutions.
RSU's package format allows the owner to estimate the budget in advance because the price is linked to the apartment's floor area.
Materials
Materials make up a significant part of the budget. Even within the same interior style, products from different manufacturers and price categories can be selected.
The following can vary most often:
- tiles;
- laminate or other flooring;
- paint;
- wallpaper;
- sanitary fixtures;
- doors;
- hardware;
- switches and sockets;
- lighting fixtures;
- decorative elements.
Therefore, when considering the price of an apartment renovation in a new building, the package contents must also be taken into account. A single price per square meter without information about the scope of work and materials says little about the final result.
Complexity of the Work
The more complex the future interior, the more time and resources may be required for its implementation. Additional structures, an unusual layout, complex ceiling geometry, a large number of lighting points, or special bathroom solutions all affect the scope of work.
At the planning stage, it is worth determining in advance which solutions are actually necessary. This helps avoid situations where the complexity of the project increases after the renovation has already started.
Engineering Systems
Electrical and plumbing systems form the foundation of the future home. At this stage, the locations of sockets, switches, lighting, sanitary fixtures, and other equipment are determined.
The more functional zones and appliances are planned for the apartment, the more carefully the engineering solutions need to be designed.
Saving money on hidden work can prove to be a poor strategy. Once the finishing work is complete, correcting mistakes in electrical or plumbing systems becomes much more difficult.
How the Renovation Budget Is Formed Before Work Begins
An apartment owner should understand the difference between a preliminary estimate and a full cost estimate. A preliminary calculation is primarily intended to answer a simple question: does the desired renovation level fit within the available budget? A full estimate contains much more detail and takes the specific property into account.
At the initial stage, it is possible to determine:
- the apartment's floor area;
- the desired renovation level;
- the number of rooms;
- whether the layout needs to be changed;
- the condition of the apartment after handover from the developer;
- preferred materials;
- the number of plumbing and electrical points;
- the need for additional structures.
This makes it easier to determine which renovation format is most suitable. If the budget is limited, priorities can be established immediately and money can be saved on solutions that have little practical value.
The way the renovation is organized also matters. When the owner hires different specialists independently, they have to supervise the workers, purchase materials, arrange deliveries, and coordinate the sequence of stages. With a comprehensive renovation, these tasks can be combined into a single process.
On the RSU page dedicated to apartment renovations in Odesa, the company describes a comprehensive work format covering individual stages from the beginning of the project to the handover of the completed property. A form for requesting an individual renovation cost estimate is also available there.
This is important because one renovation task often depends on another. Hidden utilities must be installed first, surfaces then need to be prepared, and only afterward can the finishing work begin. If the sequence is disrupted, some work may have to be repeated.
How Much Does an Apartment Renovation Cost per 1 m²?
One of the most convenient ways to make a preliminary budget estimate is to calculate the renovation cost per m2. The formula is simple:
Apartment floor area × price per 1 m² = approximate renovation cost.
According to the RSU package options provided, the indicative price in 2026 ranges from 450 to 850 €/m², depending on the selected package.
For example, for an apartment with an area of 60 m²:
- Minimal package: 60 × 450 € = 27,000 €.
- Optimal package: 60 × 560 € = 33,600 €.
- Maximum package: 60 × 670 € = 40,200 €.
- PLUS package: 60 × 850 € = 51,000 €.
Such calculations make it possible to understand the approximate budget before an individual estimate is prepared.
At the same time, the price per square meter should not be considered the only characteristic of a renovation. It is important to know exactly which works and materials are included in the selected package. With a comprehensive format, the client receives an organized renovation process rather than a set of separate construction services.
More information about apartment renovations and current RSU offers can be found on the company's relevant page. A request for an individual estimate can also be submitted there.
How Much Does It Cost to Renovate a 40 m² Apartment?
A small apartment or studio may seem easier to renovate. In practice, however, a compact floor area can be highly concentrated with functional solutions. A kitchen, bathroom, sleeping or living area, storage systems, and necessary appliances all need to fit into a limited space.
For a preliminary calculation for a 40 m² apartment:
- Minimal package: 40 × 450 € = 18,000 €.
- Optimal package: 40 × 560 € = 22,400 €.
- Maximum package: 40 × 670 € = 26,800 €.
- PLUS package: 40 × 850 € = 34,000 €.
Therefore, if the owner is considering renovation within the provided package options, the approximate budget for a 40 m² apartment ranges from 18,000 to 34,000 €, depending on the selected solution.
It is important not to confuse a preliminary mathematical calculation with the final estimate. The calculation shows the budget based on the floor area and stated package price. The specific project should be assessed separately, especially if the apartment has an unusual layout or the owner wants additional solutions.
How Much Does It Cost to Renovate a 60 m² Apartment?
An apartment with an area of 60 m² is a common format for family housing. It usually contains more living zones than a compact apartment, which means a greater overall amount of materials, engineering points, and finishing work.
The preliminary calculation is as follows:
- Minimal package: 60 × 450 € = 27,000 €.
- Optimal package: 60 × 560 € = 33,600 €.
- Maximum package: 60 × 670 € = 40,200 €.
- PLUS package: 60 × 850 € = 51,000 €.
So, how much does a turnkey renovation of a 60 m² apartment cost? Within the stated packages, the preliminary range is from 27,000 to 51,000 €.
When choosing between options, it is worth looking at more than just the price difference. The package contents, materials, scope of work, and expected result should all be compared.
If the owner wants a practical interior without an excessive number of decorative elements, there is little reason to pay for options they will not use. At the same time, abandoning important technical work simply to achieve the lowest possible price may result in additional expenses later.
How Much Does It Cost to Renovate an 80 m² Apartment?
An apartment with an area of 80 m² provides more opportunities for implementing complex layout and interior design solutions. The number of rooms increases, as does the scope of finishing, electrical, and plumbing work.
According to the provided package prices, the approximate budget is:
- Minimal package: 80 × 450 € = 36,000 €.
- Optimal package: 80 × 560 € = 44,800 €.
- Maximum package: 80 × 670 € = 53,600 €.
- PLUS package: 80 × 850 € = 68,000 €.
For an area of 80 m², the preliminary range is therefore from 36,000 to 68,000 €.
The difference between the packages becomes particularly noticeable in absolute terms at this size. That is why it is worth determining priorities before selecting the package:
- where higher-quality materials are needed;
- which rooms should receive the most attention;
- which solutions are essential for everyday comfort;
- which decorative elements can be omitted.
What Is Included in a Turnkey Apartment Renovation?
A turnkey format means that the owner does not have to coordinate numerous individual contractors independently. The work is organized as one process, from preparing the property to handing it over to the owner.
The main stages may include:
- Apartment preparation. Before work begins, the condition of the property is assessed, the scope of tasks is determined, and an implementation plan is prepared.
- Design and planning. Functional zones, furniture, sanitary fixtures, lighting, sockets, and other elements are planned.
- Rough construction work. The foundation of the future interior is created, including necessary preparation, electrical, plumbing, and surface work.
- Finishing work. Once the base is prepared, work is carried out on tiles, flooring, walls, ceilings, and other visible surfaces.
- Installation of doors, hardware, and equipment. During the final stages, the apartment receives its completed appearance.
- Inspection and handover. The result is checked before the finished apartment is handed over to the owner.
For RSU, the comprehensive format also includes the organization of material purchases. The company's website describes a structured process covering preparation, basic electrical and plumbing work, finishing, and final inspection.
Another advantage of a comprehensive approach is having one party responsible for the entire process. The owner does not need to find an electrician, plumber, tiler, painter, and other specialists separately and then coordinate their work.
Timeframes also matter. According to the conditions provided by the company, the completion period for the stated packages starts from 80 days, while the warranty period is 3 years.
Examples of completed projects can be viewed in the RSU portfolio. The portfolio allows visitors to see different approaches to the design of apartments and other spaces.
How to Assess Renovation Quality Before the Work Begins
When comparing offers from different companies, the final price should not be the only consideration. A low price may be connected with a smaller scope of work, cheaper materials, or the absence of certain services.
Before choosing a contractor, it is worth checking:
- whether a detailed scope of work is provided;
- whether the materials included in the offer are clearly specified;
- who is responsible for purchasing materials;
- how material delivery is organized;
- who supervises the workers;
- whether deadlines are clearly defined;
- what warranty applies to the completed work;
- how additional work is approved;
- how payments are made;
- whether examples of completed projects are available.
The last point is particularly important. Photos of completed apartments help assess the quality of workmanship, attention to detail, and the team's actual capabilities. Completed company projects can be viewed in the RSU portfolio.
Another important criterion is transparent communication. The owner should know who is responsible for the project, who to contact with questions, and how changes are approved. The clearer the communication system, the lower the risk of unexpected expenses or delays.
How to Reduce Renovation Costs
The desire to reduce the budget is completely understandable. However, savings should be planned carefully. An apartment renovation consists of many interconnected tasks, so a poor decision at one stage can result in additional expenses at the next.
Set the Budget in Advance
Before starting the renovation, it is worth determining the amount you are prepared to spend. This makes it easier to select the appropriate material level and establish priorities.
When there is no defined budget, renovation costs often increase because of numerous changes introduced after the work has already begun.
Plan the Layout Before Starting Work
Moving partition walls, sockets, plumbing points, or lighting after rough construction work has been completed can cost significantly more than making the correct decision at the beginning.
That is why it is important to first determine the function of each room and only then move on to implementation.
Do Not Overpay for Unnecessary Solutions
Expensive materials and complex decorative elements are not always necessary in every area. Priority rooms, such as the kitchen and bathroom, can receive more attention, while more practical solutions can be selected for other areas.
This approach helps control the budget without sacrificing the overall quality of the renovation.
Do Not Save Money on Hidden Work
Electrical wiring, plumbing, waterproofing, and surface preparation remain hidden after the renovation is complete, but they largely determine the comfort and reliability of the apartment.
If a problem appears after tiles have been installed or walls have been painted, accessing the utilities may require removing part of the finished surfaces.
Compare More Than Just the Price per Square Meter
Two contractors may offer the same or similar price per m² while providing completely different scopes of work.
Before signing a contract, it is worth checking:
- which works are included in the package;
- which materials are included;
- who purchases and delivers the materials;
- who coordinates the workers;
- what deadlines have been established;
- what warranty applies to the completed work;
- which services require additional payment.
The scope of the offer is what makes it possible to understand the actual value of the renovation.
How to Find Out the Exact Renovation Cost
An online calculation based on floor area is primarily intended as a reference. To determine the exact amount, it is necessary to consider the specific apartment, its condition, layout, engineering systems, owner's requirements, and selected package.
Therefore, the turnkey apartment renovation price depends on more than the number of square meters. Even when the package price is fixed, it is important to understand which solutions will be implemented in the specific property.
It is useful to start with a consultation and property assessment. The RSU website provides a form for an individual cost estimate where you can specify the type of property, floor area, desired renovation type, and other parameters.
For the owner, the process can be simple:
- Determine the apartment's floor area.
- Assess its condition after handover from the developer.
- Determine the desired renovation level.
- Prepare the main requirements regarding the layout and materials.
- Provide the information to a specialist to receive an individual offer.
If the apartment has not yet been accepted from the developer, it is advisable to check its technical condition first. If the property is already ready for renovation work, you can proceed with planning and package selection.
Summary
So, how much does an apartment renovation in a new building cost in 2026? Based on the RSU package options provided, prices range from 450 to 850 €/m². For a 40 m² apartment, this means approximately 18,000-34,000 €, for 60 m² - 27,000-51,000 €, and for 80 m² - 36,000-68,000 €.
These figures should be treated as a starting point. The actual budget depends on the specific apartment, its condition, layout, selected package, and the range of solutions required.
If you already own an apartment in a new building and want to know how much its complete finishing will cost, the next step is to request an individual estimate.
Contact RSU to receive an individual renovation cost calculation for your apartment and choose the most suitable option based on its floor area, your requirements, and your budget.