The following is taken into account in the cost estimate:
(This section is under development)
Plumbing works and materials (rough and finishing): Corrugated pipes, traps, valves, pipes, washbasin, toilet, bathtub/shower cabin.
Electrical installation works and materials (rough and finishing): Cable wiring, soldering junction boxes, installation of voltage relays, circuit breakers, light fixtures, hardware.
Drywall works and materials. Optional: Stretch ceilings, drywall.
Painting works and materials (rough and finishing): Spackling, priming, painting.
Flooring works and materials (rough and finishing): Underlayment, laminate/parquet. Glue, tiles, grout.
Wall works and materials (rough and finishing): Decorative plaster, wallpaper. Glue, tiles, grout.
Finishing materials and works (rough and finishing): Doors, corners, baseboards, moldings, window sills.
Additional expenses are also included in the calculation: Loading and unloading works, cleaning.
The preliminary estimate is made without: Furniture, appliances, air conditioners. You can also choose these materials.
For example, by selecting a shower cabin, you receive a calculation that includes all the works and materials: Tempered glass, drain trap.
The following are not included in the calculation: Curtains, paintings, and other decor, windows, wall leveling (plastering), and floor leveling (screeding). Demolition and installation works (works related to room reconfiguration).
You can modify the apartment area, change the perspective, and save visualizations.
Best regards, RSU Company